Work to strengthen the defence walls of the Segura in Almoradí – where the river burst its banks in September with devastating consequences – is set to be finished within the next month.
This was the prediction made by the Segura river and water authority (CHS).
Full report in Friday’s Costa Blanca News – available in supermarkets, tobacconists/newspaper shops and online at https://www.costa-news.com/